ASME B30.18 Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)

ASME
ISBN/PUB: J11316
Pub Date: 2016


ASME B30.18 Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)

B30.18 applies to the construction, installation, operation, inspection, and maintenance of hand-powered and power-driven overhead and gantry cranes that have a top or under running multiple girder bridge with a vertically guided carriage, with or without a top or under running trolley. The requirements included in this volume also apply to stacker cranes having the same fundamental characteristics, such as cantilever gantry and semi-gantry stacker cranes.

  • Publisher: ASME
  • Publish Date: 2016
  • Pages: 40
  • Language: English
  • ISBN: 9780791871140

Buy online
Price $135.00
Quantity

 
  
ASME B30.18 Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)

Winnipeg Web Design by Canada's Web Shop